The next couple of steps we absolutely have to finalise before anything else are as follows:
1. Redesign/reshape the bus stop to fit the AS 1428.2 standard. (There shouldn't be much to alter here.)
2. Redesign the now legal bus stop so that it stands up without toppling over, while still maintaining the standards.
Once we can get these out of the way, we can see what kind of material we're limited to, and also get a proper cost quote from material suppliers.
No comments:
Post a Comment